SOURCESQUID®
EN
Start a brief
Major cluster · Maharashtra

Pune – Chakan. Forgings, auto and EV and precision engineering.

Pune – Chakan, in Maharashtra, is a major national manufacturing cluster for forgings, auto parts and machined parts. Buyers come here for forgings, auto and EV and precision engineering.

Named shortlist from USD 390

110 km
to Nhava Sheva seaport
Marathi
on the factory floor
730 km
from our Bengaluru office
Locator · Pune – Chakan18.52° N, 73.86° E
Map of Pune – Chakan in Maharashtra, with nearby clusters, the nearest seaport and inland container depot Andhra PradeshDadra & Nagar Haveli and Daman & DiuGoaGujaratKarnatakaMadhya PradeshMaharashtraRajasthanTelangana Mumbai – ThaneKolhapurSilvassa – DamanBhiwandiAurangabadNashikIchalkaranjiSolapur Pune – Chakan
  • Pune
  • Nearby clusters
  • Seaport
  • Inland depot (ICD)
Nearest seaport
Nhava Sheva (JNPA) · 110 km
Nearest ICD
ICD Pithampur · 490 km
At a glance

Pune, the short version.

What the cluster makes, who works there, and how goods leave. Distances are straight-line from the city centre.

Known for
Forgings, auto and EV and precision engineering
State
MaharashtraOne of 8 clusters mapped in Maharashtra
Languages
MarathiOur team speaks Marathi
Scale
Major clusterA major national manufacturing cluster
Nearest seaport
Nhava Sheva (JNPA), 110 kmNavi Mumbai, Maharashtra
Nearest ICD
ICD Pithampur, 490 kmInland container depot for customs clearance and rail to port
State ports
Nhava Sheva (JNPA) and ICD Nagpur
From Bengaluru
730 kmSourceSquid's India office
Product families

Made in Pune, step by step.

Open a product to see its process chain. Each links to the full guide with QA tests, HS heading and lead times.

Investment castings (steel, stainless)6 steps · Samples 5–7 weeks including wax tooling
  1. Wax pattern injection · Aluminium die makes a wax replica of the part
  2. Ceramic shell building · Dipped and stuccoed in layers, then dried
  3. Dewax & pour · Shell fired, molten alloy poured at controlled temperature
  4. Knock-out & heat treatment · Normalising, hardening or solution annealing to spec
  5. CNC finishing · Critical faces and threads machined
  6. Inspection & PPAP · Chemistry, hardness, CMM report, first-article approval
Full guide to investment castings →
Machined & welded assemblies6 steps · Samples 4–6 weeks
  1. Material & cutting · Certified bar, plate and tube cut to size
  2. CNC turning & milling · VMC/HMC and turn-mill centres
  3. Welding · MIG/TIG with qualified welders and fixtures
  4. Stress relief & finish · Heat treatment, blasting, plating or painting
  5. Assembly · Sub-assemblies with torque records
  6. Inspection · CMM, weld inspection, FAI report
Full guide to machined & welded assemblies →
Tube bending & TIG-welded frames6 steps · Samples 4–6 weeks including fixtures
  1. Tube sourcing · ERW or seamless, steel, stainless or aluminium
  2. CNC bending · Mandrel bending to CLR on multi-stack benders
  3. End forming & notching · Flaring, swaging and laser notching
  4. Jig welding · TIG on fixtures for repeatable geometry
  5. Finish · Powder coat, chrome or passivation
  6. Check fixture inspection · Go/no-go fixture plus CMM on first articles
Full guide to tube bending & tig-welded frames →
Injection-moulded plastic parts with textures6 steps · Tooling and T1 samples 5–8 weeks
  1. DFM & mould flow · Wall thickness, draft and gate review
  2. Tool build · P20/H13 steel mould built in-house or by a tool room
  3. Texture · Mold-Tech or VDI texture applied to the cavity
  4. T0/T1 trials · Parts moulded, measured and adjusted
  5. CMF approval · Colour, gloss and texture signed off against master
  6. Production & PPAP · Process locked, capability study, first shipment
Full guide to injection-moulded plastic parts with textures →
Cargo nets, webbing & strap kits6 steps · Samples 2–4 weeks
  1. Yarn · Polyester or nylon high-tenacity yarn
  2. Narrow weaving & knotting · Webbing looms and net knotting machines
  3. Dyeing & heat setting · Colour fastness and dimensional stability
  4. Hardware · Hooks, buckles and cam fittings sourced and tested
  5. Sewing & assembly · Bar-tack stitching to pattern
  6. Break-load testing · Every lot tested to rated load
Full guide to cargo nets, webbing & strap kits →
Filter bags & anti-static pouches6 steps · Samples 2–3 weeks
  1. Media selection · Needle felt, anti-static grids, PTFE membranes
  2. Cutting · Ultrasonic or hot-knife cutting
  3. Seaming · Sewn, welded or taped seams
  4. Rings & fittings · Snap bands, collars and grounding straps
  5. Testing · Surface resistivity and air permeability
  6. Clean packing · Sealed, labelled per batch
Full guide to filter bags & anti-static pouches →
Electronics & PCB assemblies6 steps · Prototypes 3–5 weeks
  1. DFM & BOM check · Component availability and alternates
  2. SMT · Paste print, pick-and-place, reflow
  3. THT & wave · Through-hole parts and selective soldering
  4. AOI & X-ray · Automated optical and BGA inspection
  5. Functional test · Test jig built to your procedure
  6. Conformal coat & box build · Coating, enclosure and final pack
Full guide to electronics & pcb assemblies →
Automotive seat covers & trim6 steps · Samples 3–4 weeks
  1. Material · PU leather, fabric, foam laminates
  2. CAD cutting · Automated cutting to digital patterns
  3. Stitching · Twin-needle and decorative stitching
  4. Embossing & welding · HF welding or embossed logos
  5. Fitment check · On a buck or real seat
  6. Pack · Kitted per vehicle set
Full guide to automotive seat covers & trim →
Plastic pallets & returnable packaging6 steps · Standard designs 2–4 weeks; new tooling 10–14 weeks plus production
  1. Design & load spec · Static, dynamic and racking loads defined
  2. Tooling · Large-tonnage injection or blow mould
  3. Moulding · HDPE or PP, virgin or recycled blend
  4. Reinforcement · Steel tubes or ribs for racking
  5. Load testing · ISO 8611 style load and drop tests
  6. Branding & tracking · Hot stamp, RFID or QR
Full guide to plastic pallets & returnable packaging →
Closed-die forgings and flanges7 steps · Dies and samples 5–8 weeks
  1. Billet cutting · Certified bar cut to weight by shear or bandsaw
  2. Induction heating · Billet heated to forging temperature
  3. Closed-die forging · Hammer or press forging through preform and finish impressions
  4. Trimming & piercing · Flash trimmed and holes pierced in a press
  5. Heat treatment · Normalising, or hardening and tempering, to specification
  6. Shot blasting & machining · Scale removed; faces, bores and threads machined
  7. Inspection · Hardness, MPI or UT, dimensional report
Full guide to closed-die forgings and flanges →
Fasteners (bolts, nuts, screws)6 steps · Samples 2–4 weeks
  1. Wire rod & annealing · Rod drawn to size and spheroidise-annealed
  2. Cold heading · Heads formed on multi-station headers
  3. Thread rolling · Threads rolled for strength and accuracy
  4. Heat treatment · Hardening and tempering to property class
  5. Plating or coating · Zinc, zinc-flake or hot-dip galvanising
  6. Testing & packing · Proof load, hardness and coating checks; boxed by count
Full guide to fasteners →
Machined auto components7 steps · Samples 4–8 weeks
  1. Material · Bar, forging or casting with mill certificate
  2. CNC turning · Multi-spindle and CNC lathes
  3. Milling & drilling · VMC or HMC operations
  4. Heat treatment · Induction hardening or case carburising
  5. Grinding · Bearing seats and critical diameters ground
  6. Inspection & PPAP · CMM, SPC data and PPAP submission
  7. Rust-proof packing · VCI packing in returnable trays
Full guide to machined auto components →
Sheet-metal enclosures and brackets7 steps · Samples 2–4 weeks
  1. Nesting & laser cutting · Sheet nested and cut on fibre lasers
  2. Punching & bending · Louvres and features punched, then CNC press-brake bending
  3. Welding & grinding · MIG, TIG or spot welding; seams ground
  4. Pretreatment · Degreasing and phosphate or zirconium pretreatment
  5. Powder coating · Colour and texture to RAL
  6. Hardware & gaskets · Inserts, hinges, locks and gaskets fitted
  7. Inspection · Dimensions, coating thickness, IP check where specified
Full guide to sheet-metal enclosures and brackets →
Wire harnesses and cables6 steps · Samples 2–4 weeks
  1. Wire & terminal sourcing · Wire, terminals and connectors to the BOM
  2. Cut, strip & crimp · Automatic cut-strip-crimp machines
  3. Crimp validation · Pull-force and cross-section checks
  4. Layout on board · Harness routed on a full-size assembly board
  5. Taping & sleeving · Tape, conduit, grommets and labels
  6. Electrical test · Continuity and hipot test on every harness
Full guide to wire harnesses and cables →
Aluminium and zinc die castings7 steps · Die and samples 6–8 weeks
  1. Die design & build · H13 steel die with cooling and ejection
  2. Melting · Aluminium (ADC12, A380) or zinc (Zamak 3, Zamak 5) alloy
  3. High-pressure die casting · Cold-chamber machines for aluminium, hot-chamber for zinc
  4. Trimming & deburring · Runners, overflows and flash removed
  5. Machining · Threads, bores and sealing faces
  6. Finishing · Powder coating, e-coating or plating
  7. Inspection · X-ray for porosity, dimensions, leak test if needed
Full guide to aluminium and zinc die castings →
How SourceSquid covers Pune

Your team in Pune.

Our Bengaluru team covers Pune in person: factory search, audits, samples and inspections. This is what working with us there looks like.

  • Factory search on the groundOur Bengaluru team visits Pune to screen factories in person, then shares a named shortlist with the evidence behind it.
  • Audits before you commitOn-site audits of the strongest Pune candidates, scored on capability, quality systems and capacity.
  • Samples to golden sampleFirst articles measured against your drawing, then a signed golden sample that every lot is checked against.
  • Inspections on every lotIn-line and pre-shipment inspections in Pune to your AQL, with photo and measurement reports.
  • We speak MarathiThe language of Pune's factory floors, so questions get answered at the machine, not after a week of email.
  • Shipping via Nhava ShevaWe plan the route to Nhava Sheva or ICD Pithampur, and check export documents before the truck leaves.
Pune questions

Straight answers.

Anything else, ask us directly. A principal replies, not a bot.

anirudh@sourcesquid.co

What is Pune – Chakan known for manufacturing?

Pune – Chakan is known for forgings, auto and EV and precision engineering. It is a major national manufacturing cluster in Maharashtra, and its main product groups are forgings, auto parts and machined parts.

Which port is nearest to Pune – Chakan?

The nearest seaport is Nhava Sheva (JNPA), about 110 km away in a straight line. The nearest inland container depot is ICD Pithampur, about 490 km away. Exporters in Maharashtra commonly ship through Nhava Sheva (JNPA) and ICD Nagpur.

How do I find good manufacturers in Pune – Chakan?

Send SourceSquid a short brief with a drawing, photo or sample. We return a named shortlist of Pune manufacturers screened on evidence, then audit the strongest on site before you place an order.

Start here

Get a named shortlist of Pune manufacturers.

Send one drawing, photo or quote. We return how it is made, the right factories in the cluster and a realistic target price.

Get a free teardownTalk to a principal

Named shortlist from USD 390

Chat on WhatsApp+91 98406 98791